June 15th

To date we have 

 

  • Mobilized site office, construction equipment and materials

  • Installed perimeter safety fencing, signage, and safety controls

  • Disconnected and removed existing services

  • Commenced interior demolition

  • Commenced heritage restoration work

 

Next week (week of May 25, 2026)

 

  • Continue with the interior demolition works 

  • Continue with the Heritage Brick Salvage (exterior)

  • Complete cut line of Heritage building at the roof 

  • Tentative- Exterior works within our property to prepare for Temporary Power, ie. Excavation and cutting of asphalt

  • Tentative - Commence Main demolition of building with large 340 excavator

  • **Notices to neighbouring properties (ie. Geneva and 155 Balliol) will be provided at least a week in advance when and  if required during the demolition stage for spotters and / or protection

  • Tentative - Parking lane closure

  • A few of the above activities, ie. Main building demolition and Brick Salvage removal process will generate loud continuous noise and additional dust

  • Dust control measures will be in place during the main building demolition

 

Working Hours Remain as

  • Monday to Friday: 7:00am to 7:00pm (per the City Bylaw) however many days will observe 7:00am to 5:00pm

  • Saturday work (as required): 9:00am to 7:00pm

  • No Work on Sunday or Holidays

 

Health, Safety & Environment

  • The site will be secured at all times

  • The gate closest to the Geneva Center will remain closed at all times, except when deliveries are occurring

  • Dust suppression and noise control measures are being implemented 

  • All work will comply with the local regulation and safety standards

 

Traffic & Access

  • Pedestrian routes will be maintained

  • Traffic control personal and signage will be in place

 